afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
hospital incinerator manufacturers

SECTION V

 

  • TECHNICAL SPECIFICATIONS OF THE INCINERATOR

 

  • General Description

 

The plant must have four distinct sections that demonstrate three principles of turbulence, residence time and temperature retention. The regulated sections may include but not limited to:

 

  1. Overall plant layout
  2. Feed chamber/charging
  3. Primary combustion chamber
  4. Particulate scrubbers
  5. Acid gas
  6. The stack/chimney.
  7. Minimum capacity of primary chamber = 10cubic meters
  8. Burn rate (rate of waste incineration) = 10 kg per hour
  9. Should have a full width counterbalance loading door allowing easy access to the main chamber for loading and removing ash.
  10. The INCINERATOR should be NEMA approved in accordance with Environmental management and coordination (Waste management) Regulations of 2006.

 

  • Scope Of Work

 

The work specified in the contract will include.

 

  1. Supply, install and commission an incinerator as provided   in the technical specifications

 

  1. Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this

 

  1. Assessment and preparation  and construction of  a standard incinerator shed with one waste  storage room  ( see the design )

 

  1. Provision of operation and maintenance manuals and drawings complete with maintenance schedule and

 

  1. Fuel oil storage tank- Mild steel 1000 liters capacity

 

  1. Onsite training for operation and maintenance

 

IMPORTANT

To enable the Employer undertake conclusive evaluation of the tender, tenderers are requested to submit with their offers the detailed specifications, drawings and catalogues with Commissioning and maintenance instructions for the Incinerator they intend to Supply, install and commission.

Tenderers who fail to comply with this requirement fully shall have their tender rejected.

 

  1. TECHICAL SPECIFICATIONS OF THE INCINERATOR

 

3.1  Feeding and Charging

 

Controlled hygienic mechanical feeding that does not negatively influence the air temperature in the primary and secondary chambers of the incinerator shall be used.

 

  • Primary Combustion

 

  • This chamber should be equipped with burners that use low sulphur
  • The chamber should ensure a minimum exit temperature of 850 degrees
  • This unit should operate at over 1100 deg C to ensure complete
  • This chamber should be equipped with burners that use low sulphur
  • Heavy-duty steel casing
  • High quality refractory lining and insulation
  • Large full size top load door and liquid retention
  • 1 x oil fired ignition burners operated on/off

 

 

  • Secondary Combustion Chamber (After burner)

 

  1. Heavy-duty steel casing
  2. High quality refractory lining and insulation
  3. 1 x oil burner
  4. Should be fitted with burners that use low sulphur
  5. Ensure secondary air supply is controlled.
  6. Ensure residence time is not less than two seconds.
  7. Ensure that the gas temperature as measured against the inside wall in the secondary chamber and not in the flame zone is not less than 1100 degrees
  8. Ensure the emitted oxygen content of the emitted gases is not less than 11%
  9. Ensure both primary and secondary combustion temperatures are maintained until all waste is completely

 

  • Particulate Removers

A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:

 

  1. Cyclone separator
  2. Electrostatic precipitators
  3. Fabric filters

 

  • Chimney/Stack

 

  1. The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
  2. The chimney should be visible to the operator from the feeding

 

  1. The minimum exit velocity should be 10 meters per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
  2. The point for measurement of emissions shall be

 

  • Instrumentation

 

  1. Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary
  2. An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required
  3. A carbon monoxide and oxygen meter/recorder should be
  4. A smoke density meter/recorder should be
  5. A solid particulate meter/recorder should be
  6. Any other instrument that may be considered

 

  • Location / Siting of the Incinerator

 

  1. a) The incinerator must be sited in accordance with the relevant local municipal authority planning regulations and the topography of the site must be compatible with premises in the

 

  • Emission Limits

 

  1. Combustion efficiency (C.E) shall be at least00% where C.E = %Carbon dioxide x 100 / [% Carbon dioxide + carbon monoxide]
  2. The temperature of the primary chamber shall be 800 +/- 50 degrees centigrade
  3. The secondary chamber gas residence time shall be at least 1 second at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack
  4. Opacity of the smoke must not exceed 20% viewed from 50 metres with naked
  5. All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and
  6. A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win – Wout) /Win ] x

100 where Win = mass feed rate of the POHC in the waste stream fed to incinerator and Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere.

  1. The average dioxin and furan concentration in the emission should not exceed 80mg/m3 total dioxins and furans if measured for a period of 6 to 16

 

  • Ease of Use

 

  1. Auto
  2. No pilots to
  3. Automatic control and temperature monitoring
  4. Built-in skid facilitates placement

 

  • Fuel Efficiency

 

  1. Rapid incineration means low fuel

 

  1. Up to 20kgs per hour (dependant on application).
  2. Thick refractory lining rated to 1400 deg C in main chamber retains heat, increasing

 

  • Quality Built to Last

 

  1. Heat resistant 3mm
  2. Stainless steel

 

  • Key Features

 

  1. Low running and maintenance costs
  2. Fully Automatic and simple to operate control panel
  3. Afterburner Preheat
  4. Incineration Temperatures in Excess of 900 degrees C
  5. 3 mm Steel Casing and Fully insulated
  6. Dense Refractory Concrete Lining Rated to 1400 degrees C
  7. Solid Hearth to Allow Maximum Burnout
  8. Large Top Opening Lid For Easy Loading
  9. Stainless Steel Flue as standard
  10. 12 Months or 1000 hours
  11. Optional Stainless Steel Casing
  12. Heat Recovery System option

 

3.13 Fuel and Capacity  
1. Low sulphur fuel
2. Capacity (Cubic Mtr) .10
3. Average Capacity 40kg
4. Fuel Consumption (ltrs / hr) 3

 

  • External Dimensions

 

1. Length (mm)               735  
2. Width (mm)                500
3. Height Incl. Flue (mm) 1960
4. Door Opening (mm) 325 x 325

 

  • Internal Dimensions

 

1. Length (mm) 620
2. Width (mm) 390
3. Height 500

 

  • Operation

 

  1. Minimum Operating Temperature 950
  2. Maximum Operating Temperature 1320

 

 

3. Burn rate per hour 5-20kgs
4. Temperature Monitoring Available

 

 

  • Particulate Removers

 

 

A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:

 

  1. Cyclone separator
  2. Electrostatic precipitators
  3. Fabric filters

 

  • Chimney /Stack

 

 

  • The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
  • If possible the chimney should be visible to the operator from the feeding
  • The addition of dilution air after combustion in order to achieve the requirement of these guidelines is
  • The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
  • Point for the measurement of emissions shall be

 

  • Control Panel

 

  1. Control of 2 burners
  2. Timer control 0- 12 hours
  3. Integral fan timer control
  4. Temperature and thermostatic control

 

 

 

 

 

 

 

SCHEDULE 2

 

 

NO: REQUIREMENTS SUPPLIER’S REMARKS
1. Experience

 

Previous experience in the supply, installation and commissioning of  incinerators

 
2. 1 Year Maintenance Contract  
3. Work rate

 

at least10kg per day

 
4. Design

 

Basic Plan design to Provide Overall plant layout. With Feed chamber/ charging, Primary Combustion Chamber. Secondary Combustion Chamber. Particulate Scrubbers, Acid Gas Scrubbers, The stack/ chimney.

 

Fuel oil tank storage should be   Mild steel 1000 liters capacity

 

Chimney Height should be of 10 meters above ground level.

Housing facility with one waste storage room

 

 

Provide Housing designs with adequate cross ventilation

 

Chamber (Afterburner Maximum exit temperature should not be less than 1100oC

 
5. Standard control panel

 

Safety interlock, Fan Starter, Burner on/ off switch/door safety switch, Auto close down switch, temperatures control mechanism.

 
6. Combustion Chambers

 

Primary Combustion Chamber Minimum exit temperature should not be less than 850oC

 

Secondary Combustion Maximum exit temperature should be not less than 1100oC

 

 

SECTION VII

 

PRICE SCHEDULE FOR GOODS

 

Price schedule for Supply, Installation, Testing and Commissioning of an incinerator for Turkwel Power Station

 

1 2 3 4 5 6
Item Description Unit of sale Quantity Unit price Total price
1. Supply, install, and commission the incinerator as specified. LOT 1    
2. Construct a standard incinerator housing facility as per the drawing and architectural notes provided  

LOT

 

1

   
4. Construct one  waste  storage  room (provide specs on room size, construction material etc) LOT 1    
5. Supply / adhere to  the requirement of OSHA 2007 act

49,50,51,60,61,77,78,79,80,81,100

LOT 1    
6. Onsite training of Operation and Maintenance staff. LOT 1    
7. All the key Spares (Attach a separate List) LOT 1    
8. Supply and install 1000 liters Fuel oil storage tank and its secondary containment with Diesel oil level indicator and necessary piping with valves for visual checking of fuel level. LOT 1    
9. Supply of Operation and Maintenance Manuals.  

LOT

1    
10. All other items not specified but necessary to complete the Installation.   A separate list of these items to be attached.  

LOT

1    

 

 

11. Fencing of  a compound  of 10 meter length  by 10 meter  width   using Concrete  poles  high Gauge mesh wire , and a lockable gate. (Indicate size and design of gate) LOT 1    
  Sub Total        
           
  Discount  (%) if any        
  Applicable Taxes and Duties        
           
  Total Cost in Kshs        

 

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
Medical Waste Incinerators

Nanjing Clover Medical Technology Co., Ltd. is a leading waste incinerator manufacturer in China. We are local  manufacturer and one of the largest exporter of China.The factory workshop local in liuhe Economic Development Zone, suburb of Nanjing and business office local in downtown area. Presently, incinerator line products market cover former Soviet Union area, Africa countries, Asia countries and middle east area.   From year 2010, we negotiated with updated technology from Europe and America manufacturers and establish cooperation relationship in the territory of China market. Unfortunately, competition in other countries market, country discrimination and worries of intellectual property rights cause failure finally. Presently, we investment more effort, funds and technology development in our own brand, we are to be one of the largest incineration equipment in the world.

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
Advantages of incineration
Advantages of Waste Incineration

    Decreases Quantity of Waste. …
    Efficient Waste Management. …
    Production of Heat and Power. …
    Reduction of Pollution. …
    Incinerators Have Filters For Trapping Pollutants. …
    Saves on Transportation of Waste. …
    Provides Better Control Over Odor and Noise. …
    Prevents the Production of Methane Gas.
Incinerator Items/Model TS20(PLC) TS30(PLC)
Burn Rate (Average) 20-30 kg/hour 30-50 kg/hour
Feed Capacity(Average) 40kg/feeding 60kg/feeding
Control Mode PLC Automatic PLC Automatic
1st. Chamber Composition Hot Face Thickness: ≥115 mm Thickness: ≥115 mm
55% of Al203 55% of Al203
1750°C Grade 1750°C Grade
2nd. Chamber Composition Hot Face Thickness: ≥200 mm Thickness: ≥200 mm
75% of Al203 75% of Al203
1790°C Grade 1790°C Grade
Chamber Cold Face Material High Rate Refractory Ceramic Fiber High Rate Refractory Ceramic Fiber
Other Parts Hot Face Refractory Heavy Duty with steel fiber Heavy Duty with steel fiber
Burner operation Automatic On/Off Automatic On/Off
Dry Scrubber Including Including
Wet Scrubber Optional Optional
Top Loading Door Optional Optional
Paint for outside face 250°C Grade 250°C Grade
Sealing Material Refractory Ceramic Fiber Refractory Ceramic Fiber
Upgrade Containerized Mobile Type Optional Optional
CE Certificate CE(2006/42/EC,2014/30/EU CE(2006/42/EC,2014/30/EU
ISO Certificate  ISO9001:2015  ISO9001:2015
High-tech Enterprise Certificate  Yes Yes

What is the importance of incineration?
Incineration is widely used to reduce the volume of municipal solid waste, to 
reduce the potential infectious properties and volume of medical waste, and to 
reduce the potential toxicity and volume of hazardous chemical and biological waste.

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
plastic incineration process
nanjing clover medical technology co ltd
electic diesel incinerator
which chinese company’s are into waste management systems
how incinerators work
recycling rubbish plant
Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100 kg/hour 150 kg/hour 300 kg/hour 500 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
The control system shall include an electronic performance monitoring and logging 
system. The system shall be capable of monitoring and logging chamber temperatures 
at regular intervals (not less than once per minute, with the capacity to vary the logging 
frequency). The system shall include the capacity to download the performance data by 
USB connection.
All the measuring devices attached with the incinerator should have digital display 
and should have provision of connecting to the recording system, which should include
fuel meter and separate energy meter.
The temperature shall be determined against the inside wall of the combustion 
chambers. An audible and visible alarm shall be installed to warn the operator when 
the secondary temperature drops to below the required temperature.
The primary chamber must meet or exceed the following criteria:
“• Heavy steel construction.
 thermocouple
• temperature gauge
• fire rope
• burner
• induction air fan
• digital temperature display panel”
Optional maintenance service The contractor shall deploy an expert, fully equipped 
with all required tools and equipment, to the client to provide maintenance service of the
 installed waste incinerators, including all the parts and components (e.g., burners, 
ignitors, temperature gauges) when required.  
4.5.1 The goods, including all packaging and packing thereof, conform to the 
specifications of the Contract, are fit for the purposes for which such goods are 
ordinarily used and for any purposes expressly made known in writing in the Contract, 
and shall be of even quality, free from faults and defects in design, material, 
manufacturer and workmanship;
4.5.2 If the Contractor is not the original manufacturer of the goods, the 
Contractor shall provide UNOPS with the benefit of all manufacturers’ 
warranties in addition to any other warranties required to be provided under the Contract;
4.5.3 The goods are of the quality, quantity and description required by the 
Contract, including when subjected to conditions prevailing in the place of final destination;
The goods are free from any right of claim by any third-party, including claims 
of infringement of any 4.5.4intellectual property rights, including, but not limited 
to, patents, copyright and trade secrets;
4.5.5 The goods are new and unused;
4.5.6 All warranties will remain fully valid following any delivery of the goods 
and for a period of not less than one (1) year following acceptance of the goods 
by UNOPS in accordance with the Contract;
4.5.7 During any period in which the Contractor’s warranties are effective, 
upon notice by UNOPS that the goods do not conform to the requirements 
of the Contract, the Contractor shall promptly and at its own expense correct 
such non-conformities or, in case of its inability to do so, replace the defective 
goods with goods of the same or better quality or, at its own cost, remove the
 defective goods and fully reimburse UNOPS for the purchase price paid for 
the defective goods; and,
4.5.8 The Contractor shall remain responsive to the needs of UNOPS for any 
services that may be required in connection with any of the Contractor’s 
warranties under the Contract.

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
Small scale incinerator for hospital 5kgs 10kgs 20kgs and 30kgs per hour average
50 bed hospital proposal model TS5 or TS10 incinerator
200 bed hospital proposal model TS50 incinerator
we have more than 1000kgs per hour capacity incinerator.
How does a hospital incinerator work?
The incinerator comprises primary and secondary combustion chambers. The burning zone 
of the primary chamber is accessible through a door at the front which lets in air and allows the operator to light the fire and remove the ash. The medical waste is dropped in through a loading door above the primary chamber.
How is hospital waste disposed of?
Two common methods of disposing of hospital-generated medical waste include incineration 
or autoclaving. Incineration is a process that burns medical waste in a controlled environment. … 
State regulations may mandate off-site incineration for certain types of waste.
The main purpose of any medical waste incinerator is to eliminate pathogens from waste and 
reduce the waste to ashes. However, certain types of medical wastes, such as pharmaceutical 
or chemical wastes, require higher temperatures for complete destruction.

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
how so i buy an incineration

you have to do custom clearance your side. and shipping document with bill of lading, invoice, packing list only. we have incinerator in PK and AFG but iam not sure where it is. all incinerator passed EU CE and ISO. if natural gas or LPG fuel, you have to contact with local gas supplier to know price, we only supply gas burner. if oil fuel, we supply oil system and oil tank already. installation, we assembly all we can do before leave and local working almost on chimney, control case, oil system as our indication guider on the machine. local site have to build a incineration operation house, simple type with concrete foundation.
by now, covid19, we support online or video guide and free cost.
medical waste trucks
waste incinerator tanzania
modern incineration technology
ready mace incinerator
the need for a hospital incinerator
incinerator for hazardous waste construction
manufacturers of fuel disposal in chaina