afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
waste incinerator
waste incinerator

waste incinerator means incineration the waste by incineration. we supply waste incinerator for medical hospital waste, pet cremation and animal incineration and other solid waste treatment. the waste incinerators have 2 combustion chamber, the first burner burn the waste in the primary combustion chamber and the other burner burn the smoke from primary combustion chamber. the smoke will be filtered by smoke filter chamber and then out. the waste incinerator use stainless steel chimney which is long life time and all the burner made in italy.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
incinerator 500kg per hour
incinerator 500kg per

incinerator 500kg per hour, which model is YD500. the fuel type is diesel oil or natual gas or LPG. this model incinerator burning rate is 500kgs per hour and the feeding capacity is average 800kgs per time, accordingly to detail waste material. YD500 is also suit for big animal cremation and we supply custom made incinerator accordingly to different use. incinerator 500kg per hour is average capacity for medical waste and this is also suit for hospital waste, animal cremator and other solid waste management.

Model YD-500
 Burning Rate 500 kgs/hour
Feed Capacity 800 kgs
Primary Combustion Chamber 4000 Liters
Secondary Combustion Chamber 1500 Liters
Mix Combustion Chamber Yes
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V/380V
Power 2.24Kw
Fuel Type Diesel Oil/ Natural Gas/LPG
Burner Italy Original
Oil Consumption (Diesel Oil) 31–59.1 kg/hour
Gas Consumption (Natural Gas) 19.2–64.2 m3/hour
Internal Dimensions 257 x 147 x 108cm (primary chamber)
External Dimensions 320 x 220 x 460cm (without chimney)
Temperature Monitor Yes
Oil Tank Capacity(if oil fuel) 500 Liters
Door Opening 108 x 128cm
Chimney Length 14.0 Meters
Chimney Type Stainless Steel
Equipment Gross Weight 13000 kgs
Operation Technical Specifications
Paimary Chamber Temperature 800℃–1000℃
Secondary Chamber Temperature 1000℃-1200℃
Residency Time 2.0 Sec.
Burning Efficiency >98%

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
waste incinerator manufacturer in china
waste incinerator manufacturer in china

we are waste incinerator manufacturer in china, focus on medical waste, pet animal and other solid waste incineration treatment. waste incinerator design with single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers. standard waste incinerator fixed with italy fuel burner and staninless steel long life time chimney. standard waste incinerator also fixed with dry filter chamber which is alkaline material filter acid smoke.

Full range incinerator with Economized Small Scale incinerator, Standard Small-Large Scale incinerator, General Municipal Solid Waste Incinerator, Pet and Animal Cremation, Containerized Mobile Incinerator, High Efficient Environmental Waste Incinerator.

Items/Model YD-200 YD-300 YD-500 YD-600
Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr.
Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs
Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 2000 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chmaber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
medical waste incinerator manufacturers
medical waste incinerator manufacturers

Hiclover, medical waste incinerator manufacturers, with different model, design,marketing price.We are china incinerator manufacturer, contractor and exporter. Manufacturer make reasonable price for incinerator customer, supply medical incinerator, hospital incinerator, animal incinerators, hog incinerators, pet cremation equipment, small incinerator, pet incinerator, animal incinerator, portable incinerator, small animal incinerator, infectious waste pyrolysis machine, laboratory incinerator. HICLOVER help customer reduce purchase budget, custom made function, quality products and friendly service.

Containerized Mobile Incinerator(CA Model)

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.

Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal for military and civil camps and remote locations where infrastructure is scarce. contact with us, medical waste incinerator manufacturers

Main Feature:

— Double Combustion Chamber

— Double Italy Burner

–Burning Rate: 10-100kgs per hour

–Combustion Chamber: 0.1M3-1.2M3

— Mobile Incinerator, Standard shipping containers, Easy to move/transport system

— Free Installation, Pre-installed incinerator, Ideal for camps

— Ultraviolet lamp sterilization inside

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
double chamber incinerator
double chamber incinerator

double chamber incinerator designed for completed combustion for waste, the first(primary) combustion chamber burn the waste directly by oil or gas burner. the secondary combustion chamber burn the smoke from the first(primary) combustion chamber. high temperature combustion will completed destroy waste and made the smoke cleaner.

double chamber incinerator fit with two burner in each chamber, but for some large incinerator, we made two or three burner for the first(primary) combustion chamber, this will made the waste burn more completed and also made high burning rate.

Items/Model YD-200 YD-300 YD-500 YD-600
Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr.
Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs
Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 2000 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chmaber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
portable incinerator
portable incinerator

portable incinerator means a small incinerator so end user can move it to other place. we made portable incinerator and the weight under 2000 kgs, the burning rate from 5kgs per hour to 20kgs per hour. all designed with three combustion chamber and two oil or gas burner. this kind of portable incinerator is cheap cost for small waste out put.

Items/Model YD-10C YD-20C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs
Equipment Weight 2100 kgs 2100 kgs
Primary Chamber (Liters) 200 200
Secondary Chamber (Liters) 140 140
External Dimensions (cm) 170x140x160 170x140x160
Internal Dimensions (cm) 55x55x65 55x55x65
Oil Tank(Liters) 50 100
Door Opening (cm) 38 x 48 38 x 48
Chimney (M) 5 5
Chimney Type Stainless Steel Stainless Steel
Secondary Chamber YES YES
Mix-Combustion Chamber YES YES
Smoke Filter Chamber YES YES
Combustion Fuel Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES
1st. Chamber Temperature 800℃–1000℃ 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃ 1000℃-1200℃

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
large animal incinerators
large animal incinerators

Animal diseases, new virus strains and spread of infectious diseases are only few of the consequences of improper animal waste treatment. Incineration is the way forward for Bio-secure waste disposal. large animal incinerators is recognized as a most efficient solution for significant risk reduction in animal waste management.

※Main Feature:
— Three Combustion Chamber
— Double Italy Burner
–Burning Rate: 12-360kgs per hour
–Combustion Chamber: 0.2M3-5.5M3
※Optional Function/Parts/Material/Burning Rate:
— Stainless Steel Chimney
— Dry Smoke Filter Chamber
— Additional Burner
— Movable Platform Feeding Door
— 3-Section Wet Scrubber System
— Chimney Height Custom Made
— Upgrade/Downgrade Burning Rate

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
pet incineration equipment
pet incineration equipment

pet incineration equipment is for family pet cremation. our pet incineration equipment made with double combustion chamber, waste oil collect function, movable feeding door and also stainless steel material chimney, italy burners, etc.

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
HICLOVER Needle Incinerators-Syringe and Destroyer-Needle Destroyer
1. For clinic,lab, small hospital with low waste output capacity, no condition with other medical waste treatment(Underdeveloped country or area, or emergency situations ).
2. Doctor, nurse treat the syringes, needle, infusion set immediately after use, plug to play, no dispersion risk.
3. melting the syringes needle with 1250Celsius high temperature to metal slag, sterilization immediately. Destroy syringes, infusion set, can not use again.
Medical Needle Incinerator: Melt the needle waste, cut off syring tube with needle, cut off the infusion tube.
Model SYC19, Price: $110usd/set, MOQ: 5 sets.
EXW factory term(donot including shipping cost)
Purchase email:  [email protected]
Qustion1: If request 1-4 set only, how to do?
Answer: We will plus $50-$200usd fee per order.
Qustion2: If request more than 5 sets only, any discount?
Answer: We will  supply discount quotation accordingly.

afghanistan-incinerator australia-incinerator burkina-faso-incinerator burundi-incinerator cameroon-incinerator congo-incinerator egypt-incinerator ethiopia-incinerator georgia-incinerator iraq-incinerator kazakhstan-incinerator kenya-incinerator liberia-incinerator madagascar-incinerator malawi-incinerator mali-incinerator morocco-incinerator nigeria-incinerator oman-incinerator pakistan-incinerator papua-new-guinea-incinerator rwanda-incinerator saudi-arabia-incinerator senegal-incinerator sierra-leone-incinerator somalia-incinerator sudan-incinerator syria-incinerator tajikistan-incinerator tanzania-incinerator uae-incinerator uganda-incinerator usa-incinerator uzbekistan-incinerator yemen-incinerator zambia-incinerator
hospital incinerator manufacturers

SECTION V

 

  • TECHNICAL SPECIFICATIONS OF THE INCINERATOR

 

  • General Description

 

The plant must have four distinct sections that demonstrate three principles of turbulence, residence time and temperature retention. The regulated sections may include but not limited to:

 

  1. Overall plant layout
  2. Feed chamber/charging
  3. Primary combustion chamber
  4. Particulate scrubbers
  5. Acid gas
  6. The stack/chimney.
  7. Minimum capacity of primary chamber = 10cubic meters
  8. Burn rate (rate of waste incineration) = 10 kg per hour
  9. Should have a full width counterbalance loading door allowing easy access to the main chamber for loading and removing ash.
  10. The INCINERATOR should be NEMA approved in accordance with Environmental management and coordination (Waste management) Regulations of 2006.

 

  • Scope Of Work

 

The work specified in the contract will include.

 

  1. Supply, install and commission an incinerator as provided   in the technical specifications

 

  1. Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this

 

  1. Assessment and preparation  and construction of  a standard incinerator shed with one waste  storage room  ( see the design )

 

  1. Provision of operation and maintenance manuals and drawings complete with maintenance schedule and

 

  1. Fuel oil storage tank- Mild steel 1000 liters capacity

 

  1. Onsite training for operation and maintenance

 

IMPORTANT

To enable the Employer undertake conclusive evaluation of the tender, tenderers are requested to submit with their offers the detailed specifications, drawings and catalogues with Commissioning and maintenance instructions for the Incinerator they intend to Supply, install and commission.

Tenderers who fail to comply with this requirement fully shall have their tender rejected.

 

  1. TECHICAL SPECIFICATIONS OF THE INCINERATOR

 

3.1  Feeding and Charging

 

Controlled hygienic mechanical feeding that does not negatively influence the air temperature in the primary and secondary chambers of the incinerator shall be used.

 

  • Primary Combustion

 

  • This chamber should be equipped with burners that use low sulphur
  • The chamber should ensure a minimum exit temperature of 850 degrees
  • This unit should operate at over 1100 deg C to ensure complete
  • This chamber should be equipped with burners that use low sulphur
  • Heavy-duty steel casing
  • High quality refractory lining and insulation
  • Large full size top load door and liquid retention
  • 1 x oil fired ignition burners operated on/off

 

 

  • Secondary Combustion Chamber (After burner)

 

  1. Heavy-duty steel casing
  2. High quality refractory lining and insulation
  3. 1 x oil burner
  4. Should be fitted with burners that use low sulphur
  5. Ensure secondary air supply is controlled.
  6. Ensure residence time is not less than two seconds.
  7. Ensure that the gas temperature as measured against the inside wall in the secondary chamber and not in the flame zone is not less than 1100 degrees
  8. Ensure the emitted oxygen content of the emitted gases is not less than 11%
  9. Ensure both primary and secondary combustion temperatures are maintained until all waste is completely

 

  • Particulate Removers

A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:

 

  1. Cyclone separator
  2. Electrostatic precipitators
  3. Fabric filters

 

  • Chimney/Stack

 

  1. The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
  2. The chimney should be visible to the operator from the feeding

 

  1. The minimum exit velocity should be 10 meters per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
  2. The point for measurement of emissions shall be

 

  • Instrumentation

 

  1. Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary
  2. An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required
  3. A carbon monoxide and oxygen meter/recorder should be
  4. A smoke density meter/recorder should be
  5. A solid particulate meter/recorder should be
  6. Any other instrument that may be considered

 

  • Location / Siting of the Incinerator

 

  1. a) The incinerator must be sited in accordance with the relevant local municipal authority planning regulations and the topography of the site must be compatible with premises in the

 

  • Emission Limits

 

  1. Combustion efficiency (C.E) shall be at least00% where C.E = %Carbon dioxide x 100 / [% Carbon dioxide + carbon monoxide]
  2. The temperature of the primary chamber shall be 800 +/- 50 degrees centigrade
  3. The secondary chamber gas residence time shall be at least 1 second at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack
  4. Opacity of the smoke must not exceed 20% viewed from 50 metres with naked
  5. All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and
  6. A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win – Wout) /Win ] x

100 where Win = mass feed rate of the POHC in the waste stream fed to incinerator and Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere.

  1. The average dioxin and furan concentration in the emission should not exceed 80mg/m3 total dioxins and furans if measured for a period of 6 to 16

 

  • Ease of Use

 

  1. Auto
  2. No pilots to
  3. Automatic control and temperature monitoring
  4. Built-in skid facilitates placement

 

  • Fuel Efficiency

 

  1. Rapid incineration means low fuel

 

  1. Up to 20kgs per hour (dependant on application).
  2. Thick refractory lining rated to 1400 deg C in main chamber retains heat, increasing

 

  • Quality Built to Last

 

  1. Heat resistant 3mm
  2. Stainless steel

 

  • Key Features

 

  1. Low running and maintenance costs
  2. Fully Automatic and simple to operate control panel
  3. Afterburner Preheat
  4. Incineration Temperatures in Excess of 900 degrees C
  5. 3 mm Steel Casing and Fully insulated
  6. Dense Refractory Concrete Lining Rated to 1400 degrees C
  7. Solid Hearth to Allow Maximum Burnout
  8. Large Top Opening Lid For Easy Loading
  9. Stainless Steel Flue as standard
  10. 12 Months or 1000 hours
  11. Optional Stainless Steel Casing
  12. Heat Recovery System option

 

3.13 Fuel and Capacity  
1. Low sulphur fuel
2. Capacity (Cubic Mtr) .10
3. Average Capacity 40kg
4. Fuel Consumption (ltrs / hr) 3

 

  • External Dimensions

 

1. Length (mm)               735  
2. Width (mm)                500
3. Height Incl. Flue (mm) 1960
4. Door Opening (mm) 325 x 325

 

  • Internal Dimensions

 

1. Length (mm) 620
2. Width (mm) 390
3. Height 500

 

  • Operation

 

  1. Minimum Operating Temperature 950
  2. Maximum Operating Temperature 1320

 

 

3. Burn rate per hour 5-20kgs
4. Temperature Monitoring Available

 

 

  • Particulate Removers

 

 

A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:

 

  1. Cyclone separator
  2. Electrostatic precipitators
  3. Fabric filters

 

  • Chimney /Stack

 

 

  • The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
  • If possible the chimney should be visible to the operator from the feeding
  • The addition of dilution air after combustion in order to achieve the requirement of these guidelines is
  • The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
  • Point for the measurement of emissions shall be

 

  • Control Panel

 

  1. Control of 2 burners
  2. Timer control 0- 12 hours
  3. Integral fan timer control
  4. Temperature and thermostatic control

 

 

 

 

 

 

 

SCHEDULE 2

 

 

NO: REQUIREMENTS SUPPLIER’S REMARKS
1. Experience

 

Previous experience in the supply, installation and commissioning of  incinerators

 
2. 1 Year Maintenance Contract  
3. Work rate

 

at least10kg per day

 
4. Design

 

Basic Plan design to Provide Overall plant layout. With Feed chamber/ charging, Primary Combustion Chamber. Secondary Combustion Chamber. Particulate Scrubbers, Acid Gas Scrubbers, The stack/ chimney.

 

Fuel oil tank storage should be   Mild steel 1000 liters capacity

 

Chimney Height should be of 10 meters above ground level.

Housing facility with one waste storage room

 

 

Provide Housing designs with adequate cross ventilation

 

Chamber (Afterburner Maximum exit temperature should not be less than 1100oC

 
5. Standard control panel

 

Safety interlock, Fan Starter, Burner on/ off switch/door safety switch, Auto close down switch, temperatures control mechanism.

 
6. Combustion Chambers

 

Primary Combustion Chamber Minimum exit temperature should not be less than 850oC

 

Secondary Combustion Maximum exit temperature should be not less than 1100oC

 

 

SECTION VII

 

PRICE SCHEDULE FOR GOODS

 

Price schedule for Supply, Installation, Testing and Commissioning of an incinerator for Turkwel Power Station

 

1 2 3 4 5 6
Item Description Unit of sale Quantity Unit price Total price
1. Supply, install, and commission the incinerator as specified. LOT 1    
2. Construct a standard incinerator housing facility as per the drawing and architectural notes provided  

LOT

 

1

   
4. Construct one  waste  storage  room (provide specs on room size, construction material etc) LOT 1    
5. Supply / adhere to  the requirement of OSHA 2007 act

49,50,51,60,61,77,78,79,80,81,100

LOT 1    
6. Onsite training of Operation and Maintenance staff. LOT 1    
7. All the key Spares (Attach a separate List) LOT 1    
8. Supply and install 1000 liters Fuel oil storage tank and its secondary containment with Diesel oil level indicator and necessary piping with valves for visual checking of fuel level. LOT 1    
9. Supply of Operation and Maintenance Manuals.  

LOT

1    
10. All other items not specified but necessary to complete the Installation.   A separate list of these items to be attached.  

LOT

1    

 

 

11. Fencing of  a compound  of 10 meter length  by 10 meter  width   using Concrete  poles  high Gauge mesh wire , and a lockable gate. (Indicate size and design of gate) LOT 1    
  Sub Total        
           
  Discount  (%) if any        
  Applicable Taxes and Duties        
           
  Total Cost in Kshs