healthcare facility incinerator

* Burner with gas, mono-bloc casting assisting kind with straight fire, lights and safety and security of digital ignition, permanent ventilation, electro-magnetic sluice gate of policy and separating shutoff.
* An additional injection of air to make certain excellent oxygen content.
19. A control box guaranteeing the total cycle of burning.

20. Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air circulation being accomplished by shutoffs and adhering to the control of the automatic cycle.
21. Controls as well as policies:
Control box watertight to dust, consisting of:

* A button circuit breaker for each engine (ventilators and also heaters).
* A timer with adjustable temporization for the law of each heater.
* A regulatory authority with digital watching for the temperature level of combustion.
* A regulatory authority with digital watching for the temperature of postcombustion.
* Electric box.

21. The de- ashing has to be performed in the bottom of the combustion chamber or the deashing need to be Automatic or manual set de ashing.
22. Refine Filtering system: Scruber to be mentionned as optional
23. Emission Standards Conformity: BS 3316 or équivalent criterion
23. Capability to treat Plastic: Not much less than 40% by weight
24. CE Production Conformity: BS EN 746-2-1997
22. The provider has to give sets of extra parts of first seriousness as well as consumable of the incinerator.
23. The set up burner should bear a one year assurance.
24. The distributor shall perforn an onsite installment of the burner.
25. The technical training of drivers will have to be offered and also given by a professional from
the manufacturing facility; it will contain medicinal and also preventative upkeep, and using machine, etc

NB.: Civil works and any kind of other related services for the setup and also training of operators need to be consisted of in the burner’s cost.
Specification for the shelter of the incinerator: House of the incinerator comprehensive in offer (your house have to have facilities for hand cleaning and also firefighting).
This product and also tools must include in the shed of the burner: foundation in rubble stone, seclusion roofing versus humudity; elevation with brick of 20 cm (bloc cement), proceeding lintel (linteau) in enhanced concrete; steel frame (charpente en steel); roof covering in sheet B.C.A. 28 BG (Toiture en t?le), steel rain gutter, sanitary installation (laundry basin, soakway pit of 20 m of deepness); ash pit of 30 m3, electric setup; concrete piece for dealing with the burner; chanel for evacuation of rain water or waste water, cord mesh for oygenation up the lintel; smooth rougtcasting of walls (interior as well as outside); plinth with cement; 2 metal doors; email paints inside and also latex paints outside your home on walls and on doors; roofing limit (planche de rive); steps for this spec will certainly depend upon the dimension of the incinerator which will identify the size of the shed of the incinerator., etc

HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: sales@hiclover.com Email: hicloversales@gmail.com