Blog
Incinerator YD-30 for Australia

Incinerator Model YD-30 for Australia Melbourne customer. From year 2011 to 2013, we delivery 02 different model for this customer, one is model SYC-50 (now updated to Model TS50 PLC) and one model YD-30. Both two model is gas fuel type and these incinerator for local family pet cremation business.

Items/Model YD-30
Burning Rate (kgs/Hour) 30 kgs/Hr.
Feed Capacity (kgs) 60 kgs
Equipment Weight 2300 kgs
Primary Chamber (Liters) 360
Secondary Chamber (Liters) 200
External Dimensions (cm) 145x90x175
Internal Dimensions (cm) 100x60x60
Oil Tank(Liters) 200
Door Opening (cm) 48 x 60
Chimney (M) 5
Chimney Type Stainless Steel
Secondary Chamber  YES
Mix-Combustion Chamber YES
Smoke Filter Chamber YES
Combustion Fuel Oil/Gas
Residency Time 2.0 Sec.
Temperature Monitoring YES
1st. Chmaber Temperature 800–1000
2nd. Chmaber Temperature 1000-1200


Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.
Blog
Dual-chamber controlled air incinerator or dual- chamber pyrolytic incinerator

Types of incinerator design acceptable: Dual-chamber controlled air incinerator or dual- chamber pyrolytic incinerator

Materials of construction: The incinerator shall not have any asbestos, asbestos-containing substances, mercury thermometers, and mercury switches. Refractory materials shall be able to meet relevant standards under ISO TC33 and CEN/TC    187.Waste feed system into the combustion chamber batch or continuous loading: For continuous loading, the automatic charging ram or auger feed system shall be capable of injecting small amounts of waste at frequent intervals and should be able to prevent waste from being fed when the combustion chamber temperature is less than 850°C. In addition, the waste feed should only be able opened at or below 50°C in an ambient temperature of 21°C.Primary combustion chamber: Shall be constructed with a casing (reinforced to withstand internal pressures without deflection or damage to the refractory or other components) supported by a structural frame and provided with refractory lining and insulation
Access doors, openings, and gaps: All access doors, openings, and gaps shall be sealed to prevent emission of smoke and exhaust gas and to block admission of air during incinerator operations. Doors exposed to flame or direct heat of combustion gases shall be lined with the same type and thickness of refractory lining and insulation as that used in the combustion chamber

Grate system for the primary chamber Moving grate, traveling grate, reciprocating grate, or rotating drum grate

Primary combustion chamber temperature # 850°C with no cold spots

Secondary combustion chamber: Shall be constructed with an exterior casing (reinforced to withstand internal pressures without deflection or damage to the refractory or other components) and provided with refractory lining and insulation

Secondary combustion chamber temperature 1100°C or higher

Secondary combustion chamber residence time # 2 seconds after the last injection of air in the secondary chamber

Blog
China vows coordination as virus grows


WHO declares outbreak constitutes international public health emergency

China vowed on Friday to work with the international community to uphold regional and international health security, and reiterated it has the confidence and capability to win the battle against the novel coronavirus epidemic, which has claimed 213 lives throughout the country as of Thursday.

The pledge came as the World Health Organization declared on Thursday that the outbreak constitutes a public health emergency of international concern, or PHEIC, following an emergency meeting in Geneva, Switzerland.

The number of confirmed cases of novel coronavirus rose to 9,692 on the Chinese mainland as of Thursday, among which, Hubei province ― the epicenter of the outbreak ― reported 5,806 confirmed infections. The Hong Kong and Macao special administrative regions as well as Taiwan reported 28 confirmed cases of the disease as of Thursday. The virus has also spread to several other Asian nations and reached Australia and Europe as well.

The Centers for Disease Control and Prevention in the United States said Thursday that an Illinois woman who recently returned from China had transmitted the coronavirus to her husband ― the first known case of persontoperson spread of the pathogen in the US.

Foreign Ministry spokeswoman Hua Chunying said in an online statement on Friday that since the outbreak, China has been in close communication and cooperation with the WHO. “China will continue working with the WHO and other countries to safeguard regional and global public health security,” Hua said.

Saying the Chinese government has been taking the most comprehensive and rigorous prevention and control measures for people’s health and safety, Hua added that many of the measures go well beyond the requirements of the International Health Regulations.

“We have full confidence and capability to win this fight against the epidemic,” she said.

Also on Friday, the National Health Commission called on the international community to understand and support China’s efforts in preventing and controlling the epidemic.

The commission hopes countries from around the world will work with China to jointly prevent and contain the disease in line with the International Health Regulations as well as the recommendations of the WHO in order to safeguard regional and global public health security, according to a statement issued by the commission on its website.

WHO DirectorGeneral Tedros Adhanom Ghebreyesus, who recently wrapped up his visit to China, said the declaration was not a vote of no confidence in China. Rather it is necessary because humantohuman infections have been confirmed in other countries.

“As I have said repeatedly since my return from Beijing, the Chinese government is to be congratulated for the extraordinary measures it has taken to control the outbreak, despite the severe social and economic impact those measures are having on the Chinese people,” Tedros said at a news conference after a closeddoor meeting of the Emergency Committee.

Tedros said that the WHO does not recommend limiting trade and movement, and opposes any travel restrictions against China.

“We would have seen many more cases outside China by now, and probably deaths, if it were not for the government’s efforts and the progress they have made to protect their own people and the people of the world,” Tedros said.

“The speed with which China detected the outbreak, isolated the virus, sequenced the genome and shared it with WHO and the world are very impressive and beyond words. So is China’s commitment to transparency and supporting other countries. In many ways, China is actually setting a new standard for outbreak response, and this is not an exaggeration,” he added.

During a telephone conversation with Canadian Foreign Minister FrancoisPhilippe Champagne on Friday, State Councilor and Foreign Minister Wang Yi expressed hope that Ottawa will respect the recommendations of the WHO in an objective and fair manner to ensure trade exchanges and travel of people between China and Canada will not be influenced.

Champagne said Canada highly appreciates China’s strong measures and the open and transparent manner it has conducted itself in prevention and control of the contagion, and is also fully confident of its capability in dealing with the epidemic.

China’s top envoy to the United Nations, Zhang Jun, called on the international community to exhibit “solidarity” in dealing with the outbreak. Addressing a news gathering at UN headquarters in New York on Thursday, Zhang said the WHO recommendations “should be seriously considered” and “there is no reason for measures that unnecessarily interfere with international travel and trade”.

He called for all countries to adopt a responsible attitude, work together to combat the virus and avoid overreacting.

Since the outbreak of the contagion, leaders of foreign countries and international organizations have voiced their support for, and highly commended, China’s efforts to curb the spread of the virus.

Angus McNeice in London and Hong Xiao in New York contributed to this story.


Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.
Blog
a DUCK farm incinerator

a DUCK farm incinerator, we need to buy a medium size incinerator for biological waste, more specific DUCKS.a pet crematorium in ireland.Equipment Double chamber medical infectious waste incinerator Capacity 10-30 kg per hour Characteristics of waste
Mainly syringes and needles from immunization routine and campaign activities. However, the following average characteristics are considered*:

heating value above 2000 kcal/kg (8370 kJ/kg); content of combustible matter above 60%; content of non combustible solids below 5%; content of non-combustible fines below 20%; moisture content below 30% by weight

Combustion performance: The medica waste incinerator shall be capable of reducing waste to ash not exceeding 10% of the total combustible charges.

Outdoor installation. The medical waste incinerator will be installed outdoors.    All incinerator components shall be suitable for but not limited to outdoor shaded installation, including electric motors, be resistent to corrosion, moisture and related weather elements.

could you please forward me some information. a suitable Incinerator for Incineration of oil, plastic hazardous waste, sludge waste, hazardous filters etc.

Blog
Wuhan virus: China mobilises medical teams to fight new coronavirus


WUHAN (Bernama): China is mobilising medical staff to aid Wuhan, the centre of the novel coronavirus (2019-nCoV) outbreak, as the country reported 830 confirmed cases of pneumonia, caused by the virus and 25 deaths by the end of Thursday (Jan 23).


By Thursday midnight, Hubei Province in central China reported 549 cumulative confirmed cases of the new coronavirus pneumonia, with 495 in Wuhan, the provincial capital. Nationwide, 29 provincial-level regions have reported confirmed cases.

Twenty four deaths from the infection were reported in Hubei and one was in the northern Hebei Province, the National Health Commission (NHC) said Friday (Jan 24).

The first group of 135 medical workers from hospitals in Shanghai flew to Wuhan on Friday night. Shanghai is dispatching 405 medical workers in three groups to Wuhan.

Ma Xin, vice president of Huashan Hospital, Affiliated to the Fudan University in Shanghai, said, one hour after he issued a notice of the recruiting in the hospital, three teams, each consisting of one doctor and three nurses, were set up.

An aid team consisting of 205 experienced doctors and nurses from nine hospitals in Guangdong Province has been set up and stands ready to leave for Wuhan, said Tan Linling, an official with the provincial health commission.

Doctors, nurses and experts from hospitals in other places such as Zhejiang and Sichuan have been selected or volunteered to sign up for the task.

Hubei reported 105 new confirmed novel coronavirus cases and an increase of seven deaths related to the new pneumonia disease on Thursday, the provincial health authorities said Friday.

Nationwide, large-scale activities for the Lunar New Year celebrations, including temple fairs, winter sports and exhibitions, have been cancelled, in efforts to minimise large gatherings of people in the novel coronavirus-related pneumonia prevention and control.

Beijing’s landmark Palace Museum, also known as the Forbidden City, will stop admitting visitors from Sunday (Jan 26). The museum said it will notify the public when there is a resumption date.

South China’s Guangdong Province banned the trade of wildlife and related products in the province, as the geographical distribution of Wuhan’s infection cases indicates a close relationship between the outbreak and illegal sales of wildlife in a market.

Confirmed cases of the virus have also been reported in the regions of Hong Kong, Macao and Taiwan, as well as, such countries as the United States, Japan, the Republic of Korea and Thailand.

The World Health Organisation said, it was too early to declare the outbreak of the novel coronavirus in China a public health emergency of international concern while warning that the number of cases may rise, as much about the virus remains unknown.- Bernama

Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.
Blog
installation of waste disposable incinerator system

installation of waste disposable system in airport.Incinerator with oil burner
Capacity  2 ton/day, Oil tank 300 l  Oil pump 0.4Kw , Burner 0.2Kw
Model : YD Series
Country of Origin : ITALY.-          Diesel incinerator.

–          25Kg/h. It will have mainly paper, cardboard and food, though also it will incinerate medical waste. So the incinerator shall be able to handle organic and hazardous waste.

–          Spare parts for one year.Burning Capacity: 400kg/ Hr ( Maximum Combustion time is 6 times/ Day)
Chimney External Diameter: not more than 400mm
Fan Power: must not exceed 1.1kw
Voltage: 220V
Oil Consumption: Must not exceed 14kg/hr
Feeding Door Width: not less than 1000x1300mm
Incineration Temparature: 800 Degree or above
Emission:
CO- Must not exceed 100mg/m3
SO2- Must not exceed 400mg/m3
HF( Hydrogen Flouride)- Must not exceed 9mg/m3
NO2- Must Not exceed 500mg/m3
Smoke Dust: Must Not exceed 100mg/m3

–          The design should prevent any release of polluting substances into soil, surface water and groundwater.

–          Combustion zone has to reach at least 860 degrees under the most adverse conditions with at least 6% oxygen. Since it will treat hazardous and organic waste, temperature has to reach at least 1100 degrees for at least 2 second.

–          Flue gases must be cooled to 200 degrees or lower before flue gas treatment. The flue gas cleaning equipment maust be at least two-field electrostatic precipitator/ESP, dust <30mgNm3.

–          Thermal efficiency not less than 85%.

–          It should be equipped with filter to reduce and contain pollutants from organic and medical waste.

–          Easy to operate for almost unskilled workers.

Blog
50kgs per hour incinerator with two chambers suppliers from china
50kgs per hour incinerator with two chambers suppliers from china
*Aveage 50kgs per hour
*Double chamber and double burner
*900liters primary combustion chamber
*Italy burner
*Stainless steel chimney

Model

YD-50

 Burning Rate

Average 50 kgs/hour

Feed Capacity

Average 150 kgs

Primary Combustion Chamber

900 Liters

Secondary Combustion Chamber

300 Liters

Mix Combustion Chamber

Yes

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V/380V

Power

0.7Kw

Fuel Type

Diesel Oil/ Natural Gas/LPG

Burner

Italy Original

Oil Consumption (Diesel Oil)

12.1--23.9 kg/hour

Gas Consumption (Natural Gas)

9.9--26.1 m3/hour

Internal Dimensions

120 x 90 x 85cm (primary chamber)

External Dimensions

200 x 160 x 310cm (without chimney)

Temperature Monitor

Yes

Oil Tank Capacity(if oil fuel)

300 Liters

Door Opening

62 x 80cm

Chimney Length

5.0 Meters

Chimney Type

Stainless Steel

Equipment Gross Weight

5500 kgs

Operation Technical Specifications

Primary Chamber Temperature

800-1000

Secondary Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Burning Efficiency

98%

Waste Lower Calorific Power

3000Kcal

Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.
Blog
30kgs medical waste incinerator Model TS30 PLC
30kgs per hour(average) medical waste incinerator, design dual 
combustion chambers(primary chamber and secondary chamber), 
smoke filter chamber, PLC auto. control system, 0.33m3(330liters)
primary combustion chamber, italy oil or gas fuel burner. for small 
hospital medical waste treatment.
Buy waste incinerator, find hiclover

Items/Model

TS30 PLC

Principle

Waste Incineration

Burn Rate

Average 30kgs/hour

Fuel Type

Diesel Oil/Natural Gas

Control Mode

Programmable Logic Controller(PLC) Panel

Primary Combustion Chamber

0.33 m3

Internal Dimensions(Primary)

750x750x600 mm

Secondary Combustion Chamber

0.18 m3

Internal Dimensions(Secondary)

400 x 750 x 600 mm

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Power

0.5Kw

Oil Consumption

10.2―20.0 kgs/hour

Gas Consumption

9.8―20.0 m3/hour

Temperature Monitor

Digital Display

Temperature Protection

PLC Control

Time Setting

PLC Control, 0-120 Minutes

Oil Tank

100 Liters

Waste Feed Door

550x500mm

Chimney

5.0 Meter

Chimney Type

Stainless Steel

Primary Chamber Temperature

800–1000

Secondary Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

3000kgs

External Dimensions

1750x1200x1400 mm


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator
Medical Environmental 

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.
Blog
INCINERATOR TESTING AND COMMISSIONING

A flue chimney, 15,000mm long and 560mm diameter shall be constructed from steel sheet, complete with lagging, damper and rain water protection cone.  The chimney shall be lined with castable grade diatomaceous concrete mixed with high alumina cement in accordance with BS 4076: 1989.

The damper will control the closing of the door to not less than 85%.  The stack is to allow fresh air at the stock’s base so that the flue gases are discharged at not move then 4000 C and that the discharge conforms to the British Clean Air Act, the National Environment Management Agency (NEMA) Act or other relevant acts. .

1.1.4    POWER SUPPLY

The sub-contractor shall supply equipment which are suitable for running on a 415V, 3 phase, 50HZ or 240V, single phase, 50HZ electric power supply.

1.1.5   OIL STORAGE AND SUPPLY

The system shall consist of a bulk oil storage tank, daily tank, transfer hand fuel pump and associated pipe work.  Oil from the bulk storage tank will be delivered to a high level daily tank situated in the incinerator room by use of a transfer hand pump and automatic electric pump.

1.1.6    SPARES AND MANUALS

The tenderer is to submit with his tender a list of recommended initial stock of spares together with their prices.  A part from the burner spares mentioned here below, the spares prices are not to be included in the main summary of prices schedule but is to be separate and are meant to be ordered later if and when it becomes necessary and convenient to the client.  The burner spares whose prices are to be included in the main summary of prices schedule (BQ) are:-

i)     1No. Set of safety controls
ii)    1No. Solenoid valve
iii)    1No. Oil ignition system
iv)    2No. Photo-electric cells

Two sets of operating and maintenance manuals (both for the incinerator and burners) must also be supplied. This include two sets of control schematic diagrams for all the controls and wiring.

1.1.7   BULK OIL STORAGE TANK

The bulk oil storage tank nominal capacity of 10,200 litres and complying with BS 799 part 5: 1975 shall be positioned on three concrete cradles.

The works shall include supply, delivery, assembling, erection, testing, commissioning and setting to work.  The tank is to be of welded mild steel type with a design pressure of  40KN/m2 and storage temperature of 240  C.  It is to be located adjacent to the incinerator and boiler house.

The tank shall be cylindrical with dished end and be constructed of 6mm thick block mild steel plates in accordance with BS 1966.  Number one quality galvanised materials shall not be used.Welded construction parts shall be sprayed.

E-4

The tank shall be pressure tested with a total head of water or equivalent, measured from the base of the tank, and equal to 1½ times the sum of:

(i)     The height of the tank and
(ii)    The design head above the top of the tank that is 3.5m of water.

The pressure shall be raised slowly and steadily until the specified test pressure is reached and that pressure shall be maintained for a period long enough to permit a thorough examination to be made to ensure that the tank is sound enough and shows no leaks or undue distortion.  Welded joints shall be radiographed and a certificate issued.  Should any defects be found, they shall be made good and the test procedure repeated until the tank is certified to be sound.  The tests shall be carried out in the presence of the Engineer and subsequently, the sub-contractor will provide the Engineer with the test certificate.

The tank shall then be cleaned externally and provided with rust inhibiting primer before applying 2No. coats of bituminous paint.  The inside shall also be cleaned and purged of any foreign matter before setting to work.

Ladders and platforms shall be thoroughly cleaned and freed from rust and scale and painted with a priming coat of approved paint.

The tank shall be provided with the following:-

(i)    450mm bolted inspection covers with liquid and vapour tight joint made with a gasket of fuel resistant materials.
(ii)    75mm (3”) vent socket screwed B-SP and pipe at the higher end of the tank with an unloading device to prevent the rise in tank pressure above the design pressure.  The vent pipe shall be free from bends and shall have a continuous rise while being as short as convenient.  It shall terminate in open air in a position where it cannot be tampered with.  The open end shall be turned down and fitted with an open mesh wire cage.
(iii)    65mm diameter filling pipe with hose coupling connection
(iv)    50mm diameter gauging connection with lockable cap.
(v)     50mm diameter supply pipe
(vi)     25mm diameter water drain-off value

The tenderer shall supply hydrostatic oil contents gauge (level indicator) or a
properly calibrated stick (of dip tape) and access ladder to the top of the tank.

The filling pipe shall be extended inside the tank to within 150mm of tank bottom,
complete with anti-siphoning device.

The following information shall be permanently and clearly marked on the tank on the
centre line near the outlet connection.

•    Gross capacity in litres
•    Test pressure
•    Date of test
•    Maximum allowable working pressure
•    Manufacturer’s name of trade mark
•    Year of manufacture
•    The number of British standard and type of tank

The tank shall be installed with a 25mm fall towards the water drain-off tapping point.  The supply socket shall be extended inside the tank to prevent ingress of water in the supply line.  The main contractor shall construct tank supports and bund walls to detail drawings produced by the sub-contractor.  A valued drain off from the lowest part of the tank shall be provided complete with tail pipe and a provision for hose connection.

E-5

1.1.8    TRANSFER HAND PUMP

A semi rotary hand pump shall be provided for filling the day storage tank from the oil drum.  It shall be installed complete with all the necessary plumbing fittings and accessories.

1.1.9   DAILY SERVICE TANK

A daily storage tank of nominal capacity 1,800Litres shall be mounted at 2.5 metre high level in the incinerator room.   Tank shall be manufactured from 6mm thick pressed steel plates of 1220mm x 1220mm black mild steel sheet, complete with bolted cover and adequate venting.  The tank shall conform to BS 799 part 5 1995 and be provided with a contents sight tube. The tank shall be lagged with 50mm thick fibre glass insulation of 0.4W/m2 thermal conductivity and finished with 20SWG galvanized sheets cladding.

The tank shall be tested for any leaks of which if any is detected will be made good before the tank is painted externally with rust inhibiting paint. Tank to be securely bolted.

1.1.10  AUXILLIARY EQUIPMENT

All pipework used in the oil storage systems shall be to B.S. 1387 heavy grade.  Joints shall be screwed, and sufficient unions must be provided to allow easy dismantling the equipment.

A 25mm diameter fire valve of the quick action lever operated dead weight type shall be installed, in the oil flow line.  This shall be held in the open position by a light gauge steel cable attached to a fusible link.  The fusible link shall be mounted directly over the burner.  The warm burner oil feed pipe from the high level day tank shall be heated by an electric tracing tape properly wrapped around the pipe.  The pipe shall then be insulated with 25mm thick fibre glass insulation and finished with gauge 22swg galvanized steel sheet.

The supply pipe from the bulk oil storage tank to the high level day has been installed by others but the tenderer shall allow for connection to the high level day tank.  The tenderer shall also supply and install high capacity strainers along the supply pipe and the burner feed pipe.

1.1.11   PIPE SUPPORTS

The variety and type of supports shall be kept to a minimum and their design shall be such as to facilitate guide and secure fixing to match concrete masonry or wood.

Consideration shall be given when designing supports to the maintenance of desired pipe fall and the restraining of pipe movements to a longitudinal axial direction only.

The sub-contractor shall supply and install all steel work forming part of pipe support assemblies and shall be responsible for making good any damage to builders work associated with builders work installation.

Pipe runs shall be secured by clips connected to pipe hangers, wall brackets or trapeze type supports.  ‘U’ bolts shall not be used for clips without prior approval of the Engineer.

The sub-contractor shall submit his entire proposal for the pipe supports to the Engineer for approval before any erection work commences.

1.1.12   ELECTRICAL WORKS

All wiring between items, plant and controls shall be executed by the tenderer. The tenderer shall provide adequate supervision to ensure that electrical connections are correctly made to all items of equipment and controls supplied by him, all to the Project Manager’s / Engineer’s satisfaction.

E-6

1.1.13    INCINERATOR TESTING AND COMMISSIONING

The tenderer shall test and commission the incinerator in the presence of the Engineer.The tenderer shall also provide sufficient oil to last at least two (2) hours.  The tenderer shall test and commission the incinerator in the presence of the Engineer and verify that the incinerator is functioning according to the specifications laid here-in and in the catalogues and manuals from the suppliers of he incinerator.The incinerator performance test shall be carried out in accordance to BS3316: part 4:1987.Should any defect be detected, it shall be rectified and the testing process repeated to the Project Manager’s satisfaction.

1.1.14    FIRE INSTRUCTION NOTICE

Proceed and procure and install as below;

Print fire instruction on the Perspex plate, 3mm thick with White Colour
Background measuring 510mm lengthx380mm width as follows;

Blog
Waste Incinerator Door: Side/Front Opening Door VS. Top Opening Door
Waste Incinerator Door: Side/Front Opening Door VS. Top Opening Door

Items

Side Loading Door

Top Loading Door

Reference

Cost

Cheap

High cost

Manufacture Tech.

Easy

A litter difficult

Safty

safe

safer

Incinerator Shape

L/ I

L

Loading

manual

big door can be by Forklift

Land occupation

small

big

Ash door

same with feeding door or alone

alone

market share

Most-CHINA/USA/INDIA

Few- UK/USA

Dooring open type

Manual

Pry bar/Hydraulic pressure

Dooring Open size

small

big

Better for

medical bag waste

animal waste

open when burning

safer, can feed waste, few smoke

not safe, cannot feed waste, most smoke


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.
HICLOVER