waste incinerator manufacturer in china
  1. Burning rate: 250 Kg/hr.
  2. It should be able to Operate not Less than 10 hours/day
  3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…
  4. Design Specification: Types A, B, C, D, and E of medical waste
  5. “PYROLYTIC” combustion, by controlling the gasification of waste.
  6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
  7. It should be able to reduce the volume of wastes by 98%.
  8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.

The incineration should be completely free from visible smoke as well as offensive odours.

  1. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
  • The Temperatures of combustion:Minimum will be 850oC and max 1400oC
  • Post combustion: >1100o
  1. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter
  2. The Volume of the combustion chamber: Not Less Than 2.3 M³
  3. Burner operation should be Automatic On/Off
  4. Fuel : diesel, LPG, Natural Gas, Bio fuel
  5. The supplier must provide  necessary information for the best of  the installation

This incinerator with “PYROLYTIC” combustion must have:

  1. A combustion chamber of waste:

* Perfectly tight door for the manual loading of waste.The loading should be Manual, Batch Load,

* A burner of lighting which the use is limited to the ignition of waste.

* Top Loading loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.

* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminum and insulates bricks in order to assure a minimum temperature on   the outside sheet metal.

* Composition of the refractory;

  • Refractory concrete :
    • . Thickness : ≥100 mm
    • . Nature: 42% of Al203
  • Insulate in fibrous panels :
    • . Thickness: ≥75 mm
  • Nature: Calcium silicate.

* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.

* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.

  1. Load Method: Top Loading

 

  1. A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of injection of air allowing a total recombustion of gases,

* A device of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases burnt.

* Carcass in strong sheet steel with support of connection.

* Composition of the refractory;

  • Refractory concrete :
    • Thickness : ≥180 mm
    • Nature: 65% of Al203
  • Insulate in fibrous panel :
Español
incineradores de pequeña capacidad

Capacidad destructiva de 55 Kg / h jour de déchets hospitaliers avec un p? .C. i jusqu’à 3.200 Kcal / Kg

1) Tipo de déchet

hospitalario

2) Pouvoir calorifique inférieur 3.200 kcal / kg

3) Humedad 20%

4) Teneur en cendres et / ou inertes 8%

5) Capacidad destructiva nominal 55 kg / h

6) Volumen cámara de combustión 1,65 m3

7) Volumen de la cámara postcombustión 2,1 m3

8) Temps transit des fumées en postcombustion / sec. <2

9) Temperatura mínima en postcombustión 1.100 ° C

10) Teneur d’oxygène libre en postcombustión 6%

11) Rechazo de atribución confectionné en sachets HDPE

12) ¿Dispositivo de carga ?: hydraulique ?; capacidad de carga 0,5 m3

13) Gasoil prévu combustible

14) Br? Leur en chambre de combustion nbr ?: 1

15) Br? Leur en chambre de postcombusttion nbr ?: 2

CONSTITTUCIÓN DE L’APPAREIL.

1.CARGA

Système de chargement hydraulique afin de pouvoir charger le four en toute sécurité même durant son fonctionnement et

aussi assurer la puissance destructive globale de 450 kg / j?

Le système comprend ?:

1-1Trémie de chargement de forme parallélépipédique de 0,5 m3 de volume, réalisée en t? Le d’acier, bridés sur la paroi

frontale de la chambre de combustion et munie d’un couvercle à charnières actionné par vérin hydraulique ?.

¿Dimensiones?:

oLongueur 1200 mm

oHauteur 700 mm

oLargeur 600

1-2Un poussoir hydraulique assurera le chargement de la chambre de combustion

1-3 Une porte de chargement de la chambre de combustion constituée d’une guillotine à vérin hydraulique revêtue

de réfractaire

1-4Un central hydraulique pour piloter tous les vérins de commande, comprenant ?: réservoir, pompe, électrovannes et

tuyauteries

2.CHAMBRE DE COMBUSTION PRIMAIRE

2-1- Le bati est une structure métallique cylindrique revêtue intérieurement d’une couche d’isolant et d’une

couche de réfractaire.

2-2-volumen intérieur ?: 1,65 m3

2-3-Aménagement

? portillon de décharge des cendres ?: frontal ?; monté sur double charnière et revêtu de réfractaire avec hublot

d’inspection

? La connexion à la chambre de chargement est revêtue de réfractaire

? La connexion de la chambre de combustion et de la chambre de postcombustion est revêtue de réfractaire

? Installation des bruleurs

? Installation du système de distribution de l’air comburant

? Installation des sondes de mesure de la température

? Le bac de récolte des cendres est en acier au carbone sur roulettes, équipé de racloir métallique permettant

l’évacuation manuelle des cendres

  1. BRULEUR DE LA CHAMBRE DE COMBUSQTION

Un bruleur de type à une flamme à l’air soufflé, alimenté par gasoil, équipé des dispositifs de sécurité Puissance

thermique installée 165 KW.

  1. AIRE COMBURANTE

Le système de distribution et dose de l’air primaire en chambre de combustion comprend ?:

Centrifugadora Ventilateur

? Canalizaciones de distribución de aire

? Systéme de distribution d’air à 2 canaux

? Soupape de régulation de l’air motorisé selon les phase of cycle de fonctionnement et de la température

русский
дешевые инсинераторы

ПЕРЕРАБОТКА ПЛАСТИКОВЫХ ОТХОДОВ (НЕ ПВХ) 218 693
КАРТОН 85 046
ДОКУМЕНТ 4 956
ПВХ 15 115
ОПАСНЫЕ ОТХОДЫ МЕДИЦИНСКИЕ ОТХОДЫ 1084
ТВЕРДЫЕ ОТХОДЫ, ЗАГРЯЗНЕННЫЕ УГЛЕВОДОРОДами 300 680
ФИЛЬТРЫ МОТОРНОГО МАСЛА Б / У 85,423
ЗАГРЯЗНЕННЫЕ УГЛЕВОДОРОДОМ ПОЧВЫ 88 680
ОБЫЧНЫЕ ОТХОДЫ ВОЛОКНА 14 078
ИСПОЛЬЗУЕМЫЕ ВОЗДУШНЫЕ ФИЛЬТРЫ (АВТОМОБИЛЬНЫЕ И АНАЛОГИЧНЫЕ) 23149
СРЕДСТВА ИНДИВИДУАЛЬНОЙ ЗАЩИТЫ (СИЗ), ВКЛЮЧАЯ ЗАГРЯЗНЕННУЮ ОДЕЖДУ И АНАЛОГИЧНЫЙ МУСОР 130 861
Трупы свиней / бродячих собак и более крупные туши животных дешевые мусоросжигательные печи –
Грузоподъемность в диапазоне до 300 кг / сжигание ок. 50 кг в час

Горелка с регулируемой температурой. Мусоросжигательные заводы должны быть спроектированы в соответствии с нормами контроля загрязнения. Технология: Прочный корпус, чтобы быть качественным, прочным, надежным, экономичным мусоросжигательным заводом с соответствующим управлением, простым в эксплуатации и автономным. Устройства должны быть предварительно собраны, смонтированы, смонтированы и протестированы перед транспортировкой / экспортом.

Примечание: аналогичные технологии и / или предложения участников тендера приветствуются.

В рамках консультаций по экологическому оборудованию и технологиям и совместных закупок это Закупочное / Нотариальное бюро приглашает претендентов на предварительный квалификационный отбор с целью первичного отбора способных компаний для участия в вышеуказанном тендере.
Поставка будет включать в себя специальное оборудование для эффективного управления отходами, как упомянуто выше, для новой частной компании по управлению экологическими контрактами с запланированными операциями в 2013 году в Индонезии и Таиланде и в 2015 году в Западной и Восточной Малайзии для оказания этих профессиональных услуг в соответствии с правительственные требования по безопасному удалению отходов животноводства в регионе и соблюдение более высоких технических стандартов в этой конкретной области для защиты населения и сдерживания контагиозных и инфекционных вирусов и болезней, вызываемых животными. Распространение новой болезни свиней, также «вирусной болезни Нипах», впервые проявившейся в 1998 году в Юго-Восточной Азии, которая вызывает болезни и смерть как людей, так и свиней, снова растет; а также внезапная гибель свиноматок и хряков была зафиксирована на свинофермах Малайзии и других районах Юго-Восточной Азии.

Blog
medical waste incinerator manufacturer
GOODS:  ONE INCINERATORS IN ACCORDANCE WITH THE   SUPPLIER’    
REQUIREMENT   S OWN    
      PROPOSED    
         
      SPECIFICA    
      TION/      
      CONFIRM    
      ATION    
      SPECS    
  Incinerator walls and roof : 1550 °C castable monolithic refractory          
  concrete          
  Temperature: ≥90 °C          
  Insulation to walls: 1000 °C castable insulation          
  Electricity supply required: 220volt, 15amp single phase          
  Controls          
  Draught control: barometer indicator, door operated draught limiter          
  Air supply: built-in forced heated air ducts, primary and secondary          
  (intensifier)          
  Electric: control panel includes-circuit breakers, main switch, timer,          
  pilot lights, 2 set point pyrometer and one set point pyrometer          
             
  3.Experience and Qualifications          
  Experience and Qualifications          
  Company          
  The companies responding to this ToRs must have at least 5 year          
  experience of incinerator installation and maintenance or related          
  field. It must be registered, have trader’s licence and be compliant          
  with tax requirements.          
  Project Leader          
  The proposed expert should be able to demonstrate a breadth of          
  relevant experience in operations and maintenance of incinerators or          
  environmental management. The project leader should have at least          
  a degree in environmental management or mechanical engineering          
  or  related  field  with  at  least  5  year  experience  in  project          
  coordination.  Previous  work  in  Lesotho  or  Southern  African          
  Development Community (SADC) experience will be an advantage.          
  Health and Safety Officer          
  He/she  should  be  a  health  and  safety  professional,  such  as          
  occupational health and safety; safety, health and environment, with          
  at least 4 years of carrying out compliance inspections and audits of          
  incinerators or construction projects.  A minimum of a diploma in          
  health  and  safety  or  a  relevant  discipline  is  required.   Prior          
  experience in Lesotho will be an added advantage.          
37        
русский
производитель инсинераторов для отходов животноводства

Техническая спецификация на установку для сжигания, производитель мусоросжигательного завода
1. Две системы необходимо установить на юге Королевства Саудовская Аравия. Эти две системы будут использоваться таможенными органами для сжигания различных видов наркотиков. Все необходимое оборудование должно быть предоставлено.
2. Гарантия: на стендовые системы должна быть предоставлена трехлетняя гарантия с даты приемки. Все необходимые запасные части, профилактический ремонт и корректирующее обслуживание должны быть включены в стоимость и предоставлены заказчику.
3. Должны быть обеспечены все необходимые электрические и водные подключения.
4. Обе системы должны быть качественными и экологически безопасными.
5. Производительность каждой системы должна быть до 100 кг / час.
6. Система должна иметь автоматическую подачу.
7. Каждая система должна состоять из двух камер сжигания, одной основной комнаты для сжигания лекарства и другой комнаты для сжигания газов, выделяемых в результате первичного сжигания.
8. Духовка должна быть изготовлена из коррозионностойкой стали толщиной не менее 6 мм.
9. Каждая система должна иметь высокую эффективность при сжигании различных видов наркотиков и должна иметь эффективность 99,9% при сжигании органических материалов.
10. Количество отходов не должно превышать 5%.
11. Система должна иметь автоматическую систему зажигания.
12. Система должна использовать дизельное топливо (HSD) в качестве топлива и не должна потреблять более 8-10 л / час.
13. Каждая система должна быть снабжена топливным баком, размер которого достаточен для работы системы в течение одного полного дня.
14. Температура в первичном помещении должна быть 850 ° C ± 50 ° C. Система также должна быть способна работать при температурах до 1050 ° C ± 50 ° C. толщина.
15. Духовка должна быть снабжена теплоизолятором для облегчения работы.
16. Газ должен оставаться во вспомогательном помещении не более 1,5 секунды.
17. В помещении первичного горения должно быть не менее 2 горелок.
18. Помещение вторичного горения должно иметь одну горелку.
19. Каждая система должна иметь дверцы для золы, выход воздуха в дымоход и окна, чтобы можно было заглядывать внутрь и для обслуживания.
20. Каждая система должна иметь систему фильтрации для обработки газа с 2 резервуарами, использующими обыкновенную воду. Каждый резервуар для воды должен иметь емкость 1000 л и должен быть прикреплен к системе и снабжен индикатором уровня воды.
21.Каждая система должна иметь специальную технологию разделения продуктов и влажности после обработки газа.
22. После работы каждая система должна иметь возможность охлаждения.
23. Каждая система м должна быть снабжена выхлопной трубой диаметром 250 мм и высотой 10 м. База выхлопной системы должна быть 1000 мм. Выхлопная труба должна быть 6 мм и иметь теплоизолятор. Выхлопная система должна быть оборудована индикатором давления. Он также должен иметь лестницу и грозозащитный разрядник.
24. Электроэнергия: 220 В, 3 фазы, 60 Гц, мощность двигателя не менее 15 л.с.
25. Каждая система должна быть снабжена панелью управления и индикаторами, а также необходимым оборудованием безопасности и системами сигнализации. Панель управления должна показывать как минимум температуру в первичном и вторичном помещениях, а также в инжекторах фильтров и нагрузки.
26. Каждая система должна быть снабжена системой сигнализации для любой поломки или неисправности любого компонента системы.
27. Должны быть предоставлены следующие средства индивидуальной защиты:
А. Термостойкая одежда на 20 человек.
б) Термостойкие очки на 20 человек.
28. Все компоненты каждой системы должны быть окрашены в термостойкий серебристый цвет.

Español
QUEMADOR DE RESIDUOS BIOLÓGICOS CLÍNICOS

Debe ser un quemador de 3 cámaras.
La capacidad de carga de 250 kg.
La realidad del requisito del incinerador para poder resistir las temperaturas y, además, otras demandas útiles.
El pozo de humo debe tener un revestimiento celular refractario sólido de un tipo especial de concreto para soportar grados de temperatura por encima de 1200 ° C.
Debe tener una base sólida para que el dispositivo lo mantenga seguro, firme, seguro y protegido a lo largo de su vida útil funcional.
Las cámaras principal (quema) y también la segunda (quema) se instalarán con quemadores para una combustión confiable.
En la tercera cámara, los depuradores junto con los precipitadores definitivamente deberán configurarse como equipos de control de contaminación antes de la emisión de gases directamente al medio ambiente.
Un sistema para el Monitoreo constante de los gases de escape y el Seguimiento Ecológico.
Un sistema con el que manejar el drenaje antes de descargarlo directamente en el sistema de alcantarillado.
El control de temperatura y también los dispositivos de vigilancia (termostato de sonda) deben estar disponibles para asegurarse de que se obtengan los niveles de temperatura ideales en las cámaras durante todo el tratamiento.
Motor eléctrico eléctrico (seguidores) adecuado para hacer entrar el aire adecuado directamente en las cámaras de combustión y también conducir los gases hacia el conducto de humos 9).
Energía eléctrica de alta potencia y enlace generador de situaciones de emergencia para objetivos de encendido automático.
La chimenea debe ser lo suficientemente alta y estar al menos un metro por encima de la estructura más grande a su alrededor.
El tanque de gasolina (diesel comercial) se desarrollará cerca pero fuera del espacio del quemador para funciones de seguridad y para mantenerse alejado de los peligros de incendio. Capacidad de 250.
Diferentes otras necesidades
Formación de todos los empleados implicados en la administración de residuos sanitarios (HCW).
El sistema de alimentación automática del calentador
Sistema automático de carga de residuos con cintas transportadoras. Estos llevarán los desechos a la cámara principal inicial.
Un sistema automático de descarga de cenizas base.

Blog
incinerator manufacturers
GOODS:  ONE INCINERATORS IN ACCORDANCE WITH THE   SUPPLIER’    
REQUIREMENT     S OWN    
        PROPOSED    
           
        SPECIFICA    
        TION/      
        CONFIRM    
        ATION    
        SPECS    
  Height from base: 11m and if there are buildings within 30m of the          
  incinerator, chimney must extend at least 3m above the apexes of all          
  the roofs of such buildings            
  Diameter of chimney at top: 430mm          
  Weight of stack: ± 500kg            
  case and stack be painted with 400 °C heat resistant black paint          
  Burners            
  1st chamber 850 oC -900oC            
  2nd chamber 1000oC            
  Variable speed combustion air blowers          
  Primary chamber volume ±1.05 cubic metres          
  Mixing chamber volume ±0.30 cubic meters          
  Settling chamber volume ±0.89 cubic meters          
  Weight excluding chimney ±6 400kg at manufacture          
  Firing tools supplied: Hoe, poker and rake          
  Dimensions            
  Length ±2 125mm            
  Width ±1 890mm            
  Height  ±2 125mm            
  Extra width for burners ±1 000mm          
  Loading door opening 610mm×540mm          
  Hearth area ±1.19 square metres          
  Description of grate/hearth: A full hearth to be supplied to prevent          
  contaminated  liquids  from  flowing  into  ash  pit  without  being          
  incinerated            
  Compliance with South African Atmospheric Pollution Prevention          
  Act No. 45 of 1965 or equivalent air pollution standard          
  Documents to be supplied : Operations and maintenance manual and          
  standard operating procedures (SOPs)          
  Emission controls:            
  heated refractory screen            
  Low velocity grit settling chamber          
  Stainless steel arrester screen            
  Refractory material: alumina content ≥49% and thickness average          
  102mm            
  Bake out: to be done over 2-3 days          
  Materials of construction            
  Case: 5mm mild steel            
  Bracing: heavy angle and channel          
  Hearth: 1550 °C            
  Ashing door: high grade cast iron          
  Loading door 5mm mild steel lined with 1550 °C castable general          
  purpose high strength, high abrasion resistant monolithic refractory          
  concrete            
    36        
русский
Сжигание отходов HICLOVER Model TS75
Сжигание отходов HICLOVER Model TS75

Предметы / Модель

TS75 (ПЛК)

Картина

Принцип

Сжигание отходов

Скорость сжигания

В среднем 7 5 кг /час

Емкость подачи

В среднем 150 кг

Режим управления

ПЛК (Инсинератор с программируемым логическим контроллером)

Камера сгорания

770L

Внутренние размеры

100x81x 95см

Вторичная камера

385L

Камера дымового фильтра

да

Режим подачи

Руководство по эксплуатации

Напряжение

220В

Мощность

0,7 кВт

Расход масла (кг / час)

В среднем 16,9

Расход газа (м3 / час)

***

Монитор температуры

Цифровой дисплей

Температурная защита

да

Масляный бак

100л

Дверца подачи

99x 91см

Камин

3 метра

Тип дымохода

Нержавеющая сталь

1-й. Температура камеры

800 -1000

2-й. Температура камеры

1000 -1200

Время проживания

2.0 сек.

Вес брутто

4500кг

Внешние размеры

2,30 м x 1,30 м 2,55 м

Установка для сжигания медицинских отходов с приводом от 15 до 20 кг сжиженным нефтяным газом для сжигания высокоинфекционных материалов
100 кг в час * медицинский инсинератор * требуется при размере * 20-футового контейнера. *
100 кг / час горения с
с мощностью вторичного горения
Je suis intéressé par votre produit Longue durée de vie Pet Createur (YD-15), je veux savoir plus de détails sur:
Veuillez me proposer une liste de prix précis.
Ce serait грозный si vous pouvez me faire parvenir plus de détails sur ce produit.
Крематор для человека для кремационной машины крематория
Автоматическая установка для сжигания медицинских отходов с системой автоматической загрузки.
Емкость 150 кг КАЖДУЮ ПАРТИЮ
установка для сжигания медицинских / клинических отходов
Blog
TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals in Kenya

TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals

 

INTRODUCTION

  • All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
  • The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
  • The incinerator shall be run on a 3-phase power supply (mains)
  • For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
  • The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
  • The Bidder must provide a warranty for one year.
  • All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
  • The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
  • Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
  • Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as.  The provisional and final acceptance shall take place at the final destination.
  • After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
    • Providing the name and address of its authorised maintenance, service and repair centre,
    • Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and

 

  • The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.

 

  • It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.

 

  • The Bidder shall supply and install the incinerator with the following attached specifications

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

           
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerators to Nema standards        
  The following are the incinerator specifications :-        
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste        
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
  Carried Forward To Collection Page.        
 

 

 

NOTE: WE REQUIRE TWO INCINERATORS. ONE        
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittings

Item 1    
C Installation & commissioning works        
D Positioning of Incinerator: –

Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.

Item 1    
E Connect burners to fuel supply. No. 2    
F Chimney Installation:        
 G Composition of the chimney: –

Provide a chimney with scrubber (for filtration)

Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise.

The chimney shall be painted with approved heat resistant paint after installation.

Item. 1    
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1    
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EVALUATION CRITERIA

Evaluation shall be carried out in four stages namely preliminary examination of documents for conformance with mandatory requirements, technical evaluation, site visit and commercial evaluation.

Stage One: Preliminary Examination

– Preliminary Evaluation under special condition of the tender. These are mandatory requirements.

This shall include confirmation that a bidder has complied with the special condition of tender above.

Failure to meet any one of the above requirements stated in the special conditions of the contract shall lead to automatic disqualification.

Stage Two: TECHNICAL EVALUATION (70 MARKS)

 

ITEM DESCRIPTION UNIT QTY MARKS ALLOCATED   MARKS RECEIVED  
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerator to Nema standards        
 

 

The following are the incinerator specifications :-        
           
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste     35  
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittings

Item 1 20  
C Installation & commissioning works        
D Positioning of Incinerator: –

Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.

Item 1 10  
E Connect burners to fuel supply. No. 2 5  
F Chimney Installation:        
 G Composition of the chimney: –

Provide a chimney with scrubber (for filtration)

Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise.

The chimney shall be painted with approved heat resistant paint after installation.

Item. 1 10  
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1 10  
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3 10  
  TOTAL      

100

 

 

Pass mark for technical evaluation is 70/100 marks

 

Stage Three: Site Visit

The evaluation committee will visit the premises of the bidders who are responsive to technical  evaluation stage to verify the authenticity of statutory document submitted; ascertain the accuracy of the information given in the tender documents, assess firm’s capacity, location, among others.

The Tenderer will be automatically disqualified where false or fraudulent Information is found to have been given.

 

Stage 4 Commercial Evaluation

Bids that pass the above three (3) stages shall be compared on the basis of prices / cost quoted and the lowest priced will be considered the lowest evaluated bid and subsequently recommended for award. Prevailing market prices will be used to determine the price responsiveness of the bidders.

 


SECTION V – SCHEDULE OF REQUIREMENTS

 

ITEM

NO

ITEM DESCRIPTION UNIT QTY. REQUIRED UNIT PRICE (KHS) REMARKS
1. Supply, Delivery, installation and commissioning of Incinerator in  

 

 

NO

 

 

 

 

 

 

1

   
2. Supply, Delivery, installation and commissioning of Incinerator  

 

 

NO

 

 

 

 

 

 

1

   

 

 

 

 

Signature of tenderer

 

Note: In case of discrepancy between unit price and total, the unit price shall prevail.

 

SECTION VI – STANDARD FORMS

 

  1. Form of tender
  2. Contract form
  3. Confidential Questionnaire form
  4. Tender security form
  5. Performance security form
  6. Bank guarantee for advance payment
  7. Declaration form

 

 

 

 

Español
fabricantes de incineradores de residuos china

5-1- Chambre de post combustion est installée au dessus du foyer de combustion, elle est constituée d’un

cylindre métallique revêtu intérieurement d’une couche d ‘isolant et d’une couche de matériaux réfractaires.

5-2- ¿Volumen interior ?: 2,1 m3

Est dimensionnée pour pouvoir garantir un temps de fumée de 2 secondes à 1100 ° C avec un pourcentage d’oxygène libre

d’au moins 6%.

5-3 -Accesorios

? Trappe de visite boulonnée frontal pour permettre l’inspection périodique

? La liaison à la chambre de combustion est tapissée de réfractaire

? Instalación de les br? Leurs

? Instalación de sondes de mesure température

  1. PRODUCCIÓN DE L’AIR COMBURANT DE LA CHAMBRE DE POST COMBUSTION

Centrifugadora Ventilateur

? Tuyauteries de distribution d’air

? Série de vannes de distribution d’air

? Soupape de régulation de l’air soufflé asservi par la sonde du débit d ‘oxygène

  1. BRULEUR DE LA CHAMBRE DE POST COMBUSTION

Sont prévus 2 br? Leurs du type à l’air soufflé au gasoil équipés des dispositifs de sécurité.

A la mise en route du cuatro les deux br? Leurs sont allumés pour assurer la température minimale d’au moins 1100 ° C ?;

ils restent en marche sucesivement pour maintenir la température constante.

Puissance thermique installée (290 + 350) KW.

  1. QUIMICA DE EVACUACION

Constitué par un conduit métallique vertical de 8 m de long installée au-dessus de la chambre de PC, diamètre 630 mm

en t? le d’acier au carbone avec garnissage intérieur en réfractaire

  1. REGLAMENTO ARMOIRE ELECTRIQUE DE COMMANDE ET

Composée de ?:

? Circuito 380 V- 50 HZ-3 fases

? Voyant sous tension

? Commande d’arrêt général

? Voyant état des bruleurs

? Affichage des températures des deux chambres

? Minuterie des temps des ciclos.

? Una variación des vitesses des ventilateurs

? Le tableau et les cablages sont prévus aux règles CEI avec protección IP 55

? Microprocesseur pour le contr? Le et la régulation des températures, ainsi que les cycles d’opération

? Cablages réalisés selon les règles CEI.

  1. INSTRUMENTATION DE CONTROLE ET DE MESURAGE CONTINU

Les dispositifs suivants sont prévus ?:

1) ¿Termopares para la mesure de la température en chambre de combustion? et postcombustión, à la sortie de

l’échangeur dans la section d’entrée du filtre

2) Système de mesure de la concentración d’oxygène dans les fumées humides a la sortie de la chambre de postcombustión

constitué de ?:

? Sonde de mesure de l’oxygène à l’oxyde de zirconium

? Pompe à la membrana

débitmètre

El Contratista suministrará un Incinerador en régimen de alquiler en un lugar establecido por la Compañía. La

El contratista debe proporcionar personal capacitado y competente con la instalación inicial, puesta en servicio y operación.

formación bajo la supervisión del técnico del fabricante. El incinerador debe ser mantenido y operado para

especificaciones del fabricante por personal capacitado. El contratista debe tener suficiente personal capacitado y competente para

operar el incinerador durante todo el período del contrato. Las especificaciones del incinerador se adjuntan en el Apéndice A.